When waterproofing systems break down, water doesn’t just “seep in” — it penetrates, spreads, and damages everything it touches. The longer it’s ignored, the more destructive (and expensive) the outcome.
We don’t just seal leaks — we solve the roof cause and protect the whole property for the future..
A: Most failures come down to poor installation or ageing systems. Common causes include:
• Incorrect substrate preparation or detailing at junctions.
• Movement in the structure not accommodated with joints.
•Cheap or incompatible membranes and sealants.
• Blocked or inadequate drainage.
• Sun, traffic, or chemical exposure degrading the system over time.
When waterproofing fails, it quickly leads to leaks, corrosion, structural damage, and disputes.
A: True remediation is not a patch job. It requires:
• Investigation & testing to confirm leak paths.
• Full membrane removal where systems have failed.
• Substrate rectification (screed, falls, drainage points).
• New waterproofing system installation — liquid, sheet, or combination.
• Protective finishes (tiles, topping slabs, coatings).
At Atomic Projects, every system is installed under ITPs and manufacturer specifications, ensuring DBP compliance.
A: Costs vary with size, system type, and finishes:
• Small balconies/bathrooms: $10k–$50k+.
• Podium or roof membranes: $200k–$1m+.
• Basement injection/lining systems: $100k–$500k+.
We always provide itemised, transparent scopes, backed by engineer or manufacturer certification.
A: Waterproofing is only as good as its certification. We provide:
• Manufacturer system warranties (10–20+ years depending on system).
• Workmanship warranties on installation.
• Defects liability periods as standard.
• DBP compliance packs including test results, ITPs, and photographic records.
This ensures owners and strata managers have a defensible record for future protection.
A: Clear indicators include:
• Water ingress into apartments, basements, or car parks.
• Efflorescence (white salts) on walls or slabs.
• Peeling paint, mould, or damp smells in internal areas.
• Ponding or bubbling membranes on rooftops or podiums.
Tile cracking or grout failure on balconies and wet areas.These are not cosmetic issues — they’re warning signs of systemic membrane failure.
A: Timelines depend on location and access:
• Balconies or bathrooms: 1–4 weeks per area.
• Podiums or rooftops: 2–6 months depending on scale.
• Basements & car parks: staged programs over several months.
We plan sequencing to minimise downtime for residents while ensuring full curing and compliance.
A: Waterproofing remediation can be disruptive — we manage it with care:
• Restricted use of balconies, bathrooms, or rooftops during works.
• Noise and dust from demolition and substrate prep.
• Temporary relocation in cases of wet area rebuilds.
Atomic Projects uses staged handovers, clear communication, and strict safety measures to keep disruption minimal.
A: Contact Atomic Projects — Sydney’s remedial waterproofing specialists.
We diagnose leak paths, rebuild substrates, and install engineered, certifiable systems that protect buildings long-term.
📞 Call us: 0410 515 509 | ✉️ hello@atomicprojects.com.au