Cladding failure compromises more than just aesthetics. It exposes buildings to water ingress, structural damage, fire risk, and non-compliance—putting safety, asset value, and reputation on the line.
We go beyond just replacing panels — our cladding solutions ensure safety, compliance, and long-term durability.
A: Cladding replacement is driven by both compliance and safety. Failures and risks include:
• Combustible cladding (ACP/PE panels) that don’t meet fire compliance.
• Water ingress behind cladding causing rot, corrosion, or mould.
• Poor installation detailing (flashings, joints, sealants).
• Ageing or damaged panels from UV, weather, or mechanical impact.
Replacing cladding ensures buildings are safe, compliant, and insurable.
A: True remediation includes:
• Investigation & compliance review (fire rating, NCC requirements).
• Removal and safe disposal of non-compliant cladding.
• Inspection of substrates, framing, and sarking for hidden damage.
• Installation of compliant systems (non-combustible aluminium, fibre cement, terracotta, etc.).
•Sealing, waterproofing, and finishes for a complete façade system.
Atomic Projects delivers end-to-end cladding upgrades with DBP Act compliance.
A: Costs vary with height, access, and system selection:
• Low-rise cladding upgrades: $200k–$1m.
• Mid-rise buildings: $1m–$5m.
• High-rise towers: $5m–$20m+.
We provide transparent breakdowns of removal, access, system type, and finishes, so committees know exactly where levies are spent.
A: We provide full compliance and protection:
• Product warranties (10–30+ years depending on system).
• Workmanship warranties on installation.
• Fire compliance certification for non-combustibility.
• DBP Act compliance packs with as-built documentation.
This ensures buildings remain certifiable, defendable, and insurable.
A: Indicators include:
• Building flagged on the NSW Cladding Register.
• Insurance refusals or exclusions related to fire risk.
• Water staining, leaks, or façade movement.
• Warped, cracked, or loose panels.
• Engineer or council orders for remediation.
These signs point to both compliance risks and physical failures.
A: Timelines depend on building size and access:
• Low-rise façades: 2–4 months.
• Mid-rise buildings: 4–8 months.
• High-rise complexes: 8–18 months (often staged).
We provide staging plans so works are delivered safely with minimal tenant disruption.
Scaffolding or mast climbers may restrict balconies.
• Noise and dust during removal and installation.
• Safety exclusion zones around building perimeters.
Atomic Projects maintains clear communication, live progress updates, and strict safety controls.
A: Contact Atomic Projects — specialists in replacing combustible and non-compliant cladding with safe, certified, and durable systems.
We deliver projects that restore compliance, protect residents, and preserve asset value.