Rooftop leaking? We stop it at the source.
Sheet membrane replacement, manufacturer warranty. We replace failed systems — we don't coat over them. 10-year warranty for strata & commercial buildings.
Get a quote





Did you get a quote that's made your stomach drop?
Most strata committees overpay by 20–30%. I'll show you how the system loads that cost onto you — and how to spot it before your next AGM.
The proof is in the projects

High-rise strata — Miranda
We stripped each roof back to substrate, found the root-cause of failure and installed a new sheet membrane system with proper falls and drainage.
We staged one roof at a time so residents always had access to their garages below.

Mid-Rise Strata — Warwick Farm
Completing the works in one go ensured minimal time during the works.

High-rise strata — Darling Point
Failed membranes replaced with a high-performance system designed for coastal UV and wind-driven rain.
Works planned to maintain resident access and protect premium finishes below.
Four steps to remediation.
Fill in the form or call us. Tell us about your building and what's happening. We respond within 24 hours.
We visit your building, inspect the defects, and collect photos, scans, and evidence your engineer can act on.
You receive a clear methodology, fixed-price quote, and timeline. No surprises. Ready for committee approval.
Engineer-directed remediation with weekly progress reports, QA documentation, and minimal disruption to residents.
Get your building assessed.
Tell us about your building. We'll respond within 24 hours with a site assessment plan and clear next step — no obligation.
Get a quote
Common questions
We test it.
Water can travel a long way between entry point and where it shows up inside.
We use systematic testing and sometimes invasive inspection to confirm the path before we quote.
If the membrane is past its life, patching just moves the problem to the next weakest point.
We'll be straight with you about whether targeted repair makes sense or whether it's time for a full replacement.
We plan for it.
Temporary protection systems go in before we strip anything, and we sequence the work so the building is never left exposed.
Sydney weather is part of every roof program we plan.
Typically 3 to 6 months depending on the size and complexity.
Mechanical plant, penetrations, and drainage details all affect the timeline.
We work around it.
HVAC, antennas, and other services get temporary protection or are briefly relocated.
We coordinate with your building manager so nothing gets disrupted.
Your roof deserves better.
Start with a conversation. We’ll visit your building, assess the situation, and give you a clear path forward — free, no obligation.
Book Your Free Assessment